What is overrun? |
In order to maintain the highest quality possible on each project, each disc goes through quality control when it is produced. The ones that do not pass the tests will need to be replaced. Therefore, up to 10% more discs are manufactured in the beginning to ensure that all failed discs can be replaced. |